In-roof solar and a battery · Derby
16-panel GSE in-roof system · Tesla Powerwall 3
Trevor came to us after a national installer walked away on installation day. Summer savings of £120 - £130/month.
Jobs we've completed for homes and businesses: what we fitted and where.
Certified & Accredited By
Featured project · Manufacturing
Rooftop solar for an energy-intensive manufacturing site, with EV charging for staff and fleet vehicles.
263 kWp · 446 panels · 4 Solis inverters (200 kW in total)
Estimated: £43,157 a year saved · 3.5-year indicative payback
16-panel GSE in-roof system · Tesla Powerwall 3
Trevor came to us after a national installer walked away on installation day. Summer savings of £120 - £130/month.
16 Aiko 460 W panels · 6 kW Fox ESS inverter · 10.36 kWh battery unconfirmed
"Do it. You won't regret it."
12 Aiko 460 W panels · 10.36 kWh Fox ESS battery · Project EV charger unconfirmed
"My electricity bills are now a third of what they used to be."
8 LONGi 480 W panels · 3.68 kW inverter · EcoFlow PowerOcean, two 5 kWh batteries unconfirmed
8 LONGi 480 W all-black panels · 5 kW Fox ESS hybrid inverter · EP12 battery unconfirmed
502 kWp · 1,128 JA Solar 445 W panels · 4 × 110 kW Solis inverters
A 507,000 sq ft warehouse, awarded to us by HEB Group.
648 panels · 4 SolaX inverters (290 kW in total)
Two school buildings, each with its own system: Old Hall (444 panels) and the Music Block (204 panels).
130 kWp system · 220 panels · 2 × SolaX inverters
Panels on the east- and west-facing roofs of the clubhouse, and a 22 kW EV charger in the car park unconfirmed.
110 kW of solar across two sites unconfirmed
Batteries at the larger site, none at the smaller one, where they wouldn't have paid back unconfirmed.
8 chargers
Six 22 kW dual floor-mounted chargers and two 7.3 kW chargers, with groundworks
6 chargers
Six Project EV chargers
3 chargers
Three 7 kW dual pedestal chargers, with groundworks
3 chargers
Three 7 kW dual pedestal chargers
3 chargers
Three 7 kW dual wall-mounted chargers
2 chargers
Two 22 kW dual floor-mounted chargers and cabling for eight more, with groundworks
1 charger
A dual 7.3 kW Project EV charger
Tell us about your home or business.
There's no obligation to go ahead with our quote.
Battery or EV charger only? Request a call back
Within 24 hours.
At your convenience.
Solar panel installation, grid paperwork, handover and support.
For businesses: site survey and half-hourly energy review, then a proposal with spec, funding options and DNO path, and an install planned around your operations and site.